Manufacturing process of double girder bridge crane with open winch of 130 t capacity, 20 m span and 18 m HOL.
Customer: Pekabex | Place of installation: Poznan, Polonia | Capacity: 60t | Span: 7750mm | Lifting height: 5750mm
Customer: ANDRITZ HYDRO y socio local ENSULMECI | Place of installation: Central Hidroeléctrica Baixo Sabor, en el norte de Portugal | Capacity: 115/12,5t
Customer: Gamesa Eolica | Place of installation: Brasil | Capacity: 130t | Span: 20m
Customer: Acciona | Place of installation: Barásoain (Navarra) | Capacity: 160t
Customer: Edenor / Pampa Energía | Capacity: 5t
Customer: El Burullus Power Plant Project | Place of installation: Egipto | Capacity: 25/20t
Customer: Haize Sica | Place of installation: Santa Fe | Capacity: 50t
Customer: Power Electronics | Place of installation: lliria (Valencia) | Capacity: 10t | Span: 24,1m
Customer: Engie | Place of installation: Chilca, Perú | Capacity: 20t
Customer: Hafslund | Place of installation: Noruega | Capacity: 70t
Customer: Enel Distribución Perú | Place of installation: Perú | Capacity: 3,2t | Span: 6.85m
Customer: Central Hidroeléctrica Angostura | Place of installation: Chile
Customer: New Assiut Barrage | Place of installation: Assiut Barrage, Egipto
Customer: Central Hidroeléctrica de la Lentilla | Place of installation: Francia | Capacity: 32t
Place of installation: Allen, Río Negro, Argentina | Capacity: 35t
Customer: Central Hidroeléctrica Carhuac | Place of installation: Lima, Perú | Capacity: 50/10t
Place of installation: Saint Nazaire (Francia) | Capacity: 10t
Customer: Elecnor | Place of installation: Camerun | Capacity: 110/10t
Customer: CAF | Place of installation: Estados Unidos | Capacity: 32/10t
Customer: Hidroeléctrica EPM | Place of installation: Colombia | Capacity: 300/25 t
Customer: Windtechnic Parque eólico de Tres Picos | Place of installation: Argentina
Customer: Windtechnic Parque eólico de Tres Picos | Place of installation: Argentina