Dry docking: the simplest solution to increase boatyard capacity and improve service without underta
Dry Docking Facility in Barcelona:
Maximum boat dimensions: 9 m | 4 tonnes
Automated retrieval time: Every 5-8 minutes
Capacity: 222 vessels
follow us on
Start of Operations at XEOS and New Opening
XEOS, a joint venture between GE Aviation and Lufthansa Technik, has started service operations and opened its new facilities at ŚrodaŚląska (Poland), where several GH CRANES & COMPONENTS bridge cranes are installed.
5t gantry crane in Algeria
Video of 5t gantry crane in operation with a hydraulic bucket in Algeria.
Gantry Crane Installed in Norway
Double-rail gantry crane with a 2x16t lifting capacity for Datek installed in Norway.
Optimize the customized after-sales service
A project to enhance and optimize the customized after-sales service of its cranes.
Rail Tunnels Follo Line
GH CRANES & COMPONENTS gantry cranes are present in the important project of the longest rail tunnel construction of Norway.