With the use of the GH CRANES & COMPONENTS gantry cranes the prefabricated concrete voussoirs are transported into the tunnel. The three tunnelling machines that are operating carry out the task of lining the tunnel with the voussoirs.
follow us on
Video of Alqueva Reservoir
80 ton GH CRANES & COMPONENTS gantry crane on the wall of the Alqueva dam.
Luagher Corporative Video
EOT Crane Engineering and Construction.
Cosentino Corporative Video 2014
Grupo Cosentino distributes its brands in over 60 countries.
ACCIONA Windpower’s main market (Brazil)
The ACCIONA Group has contracts in the country – either signed or contingent - for the supply of turbines totaling 837 megawatts (MW).
Lecitrailer Corporative video 2014
Lecitrailer Corporative video 2014, Spanish towing and semi-towing manufacturer.