With the use of the GH CRANES & COMPONENTS gantry cranes the prefabricated concrete voussoirs are transported into the tunnel. The three tunnelling machines that are operating carry out the task of lining the tunnel with the voussoirs.
follow us on
Visit to Renault Valladolid by Pedro Sánchez
Pedro Sánchez visits the facilities of Renault Valladolid where a GH CRANES & COMPONENTS double girder overhead crane with a 35/35t capacity hoist is installed.
Cranes GH CRANES & COMPONENTS - Certex
Installation with four overhead cranes, a transfer cart and an external gantry crane GH CRANES & COMPONENTS at the Confac facilities, a company dedicated to manufacturing prefabricated concrete for housing construction.
Cosentino Business Video
A company that works in stone processing and has several GH CRANES & COMPONENTS bridge cranes at its facilities.
Dry docking: the simplest solution to increase boatyard capacity and improve service without underta
Dry Docking Facility in Barcelona:
Maximum boat dimensions: 9 m | 4 tonnes
Automated retrieval time: Every 5-8 minutes
Capacity: 222 vessels
El proyecto más grande del año de MPH Cranes
Completion of the installation, inspection, and start-up of one of the main projects of the year (2015) by our distributor in Singapore, MPH Cranes.